@Morten and other dev.
If I want to track or blame the last codecompletion refactor branch, which is created and maintained in year 2009. How can I do that?
For the current cc branch, I can only show the change log from: rev 6221 (the new ccbranch is created ) to rev 6392. If I remember correctly, when the rev 6221 is created, you have delete the old cc branch, right?
Thanks.